1 Week Till Completion

House is almost completed and 1 week until the house will be ready for the cleaners to come through and the flooring to be done..... Almost over the line

Lots of random photos below:
Inside Fire Place

Fire Place

Hall Way

Hot Water System

Kitchen Bench Lights

Rangehood

Dishwasher

Big Downlights (Brightgreen D900)

Ceiling Fans (Clipsal)

Shower Screens

Ceiling Fan & Air Con

Toilet

Smoke Detector

Ensuite Mirror

Outdoor Speakers

Rangehood Exhaust

Outdoor Lights

Front of House

Garage Lights

Bathroom Mirror
Outdoor Spotlight



Saturday 16 November 2013

Concrete and Paint

Sorry it has been a few weeks since I have updated the blog but things have been happening and slowly getting closer to being finished.

We have had the painters in the last two weeks and concreter on Thursday and Friday, slight issue with the concrete but hoping it will be fixed next week.

Also septic tank, rain water tank and crossover done.

Garage and front slab

More Paths

Front Entrance



Laundry Door

Septic Tanks

Alfresco

Walls Almost Finished

Doors being paited

Rain Water Tank

Internal Garage Door

Front of house

Crossover

Wednesday 6 November 2013

Tiles Pictures

Pictures of the tiling completed and the paint completed for the for the alfresco area.












Sunday 3 November 2013

Tiles Completed

No photos for this week but have been told that the tiles have been completed and painting will start this week.

I have included a picture of the current house and garden design and would love some feedback!!!!!


Up the back is the chicken run and the raised garden beds are the vege garden.