Wednesday 21 August 2013

Bricks Finished (Almost)

Well the back door has been installed and most of the brick work has been completed. Hopefully roof guys and brick guys onsite tomorrow and Friday.

Entrance

Right side

Back doors installed



Study and front lounge

Front of house

Alfresco


Saturday 17 August 2013

Garage Completed

Just spent a day out at the house yesterday clearing as much of the long grass as possible in an attempt to get the soil to dry out.

Had a look through and the garage looks to have been completed and this week am expecting the roof and more of the bricks to be completed.

Toilet Windows

Garage Door

Garage Entrance

Garage

Garage

Garage

Block After Clearing

Block Before Clearing

Thursday 8 August 2013

Wood Heater

Ok have got some information around the wood heater and included a link, video and few pictures below:

Light fire at push of a button
(Similar model but about 15% smaller than the one we are getting)


The face we are having

Link to a few more details about the heater: http://www.lopi.com.au/wood/flush-hybrid.html

Windows

The windows have been installed, most of the roof trusses and the plumbing has been roughed in. Brick work is due to start tomorrow and roof should start next week.

All windows and doors are 4/8/4 double glazed.

Main Bedroom Window

Bedroom 3 Window

Bath Plumbing

Rear of House

Outdoor Tap and watering system outlet

Kitchen Bench Plumbing

Study Window

Missing Garage

Front of House